March 2025 – August 2025Carretera Norte Widening
Widening of a highway section, covering excavation, earthmoving and rock breaking, along with subgrade preparation for the paving that followed. Heavy equipment was used to remove and reposition material, holding the grades and slopes required by the construction drawings.
September 2025 – January 2026Vial Sur Paving
Asphalt paving of a highway section, including base compaction, tack coat and asphalt laying with specialized equipment. The work was carried out in stages to keep the road open throughout construction.
January 2026 – presentYucatán Grade Separation
Construction of a grade-separation structure, with earthworks, foundations and supporting road infrastructure. The project coordinates several construction stages, from site preparation through to the structural work.
May 2025 – October 2025Rural Road Rehabilitation
Rehabilitation and grading of a rural road, with excavation, material removal and earthworks shaping, to improve how passable the stretch is.