§01 — Projects

Road work delivered in Yucatán.

Four projects between 2025 and 2026, each with its construction period.

Excavator loading rock during the highway widening
March 2025 – August 2025

Carretera Norte Widening

Widening of a highway section, covering excavation, earthmoving and rock breaking, along with subgrade preparation for the paving that followed. Heavy equipment was used to remove and reposition material, holding the grades and slopes required by the construction drawings.

Asphalt being laid by a paver with the crew on site
September 2025 – January 2026

Vial Sur Paving

Asphalt paving of a highway section, including base compaction, tack coat and asphalt laying with specialized equipment. The work was carried out in stages to keep the road open throughout construction.

Finished road surface next to ongoing works
January 2026 – present

Yucatán Grade Separation

Construction of a grade-separation structure, with earthworks, foundations and supporting road infrastructure. The project coordinates several construction stages, from site preparation through to the structural work.

Motor grader rehabilitating a rural road
May 2025 – October 2025

Rural Road Rehabilitation

Rehabilitation and grading of a rural road, with excavation, material removal and earthworks shaping, to improve how passable the stretch is.